
Excerpt
Especially this morning as he stumbled to
the toilet, dropped to his knees, and wretched his guts out. For
maybe ten or twenty minutes Joel, continued to engage in the ritual
of dry heaves. And every time he thought it was over, because
he needed to get to his office, his entire body would be overcome
by yet another compelling desire to puke and he would once
again gag into the toilet. Once the heaves subsided, Joel was
wasted of whatever strength he might have. The coolness of the
porcelain toilet bowl on his forehead was a comforting feeling as
he rested to regain his strength to rise. Eventually, knowing that
he just could not afford to be late again, Joel rose, brushed his
teeth, and shaved. Lately, Joel had taken to simply using the
razor every other day. But looking at himself in the mirror this
morning, Joel realized that it had probably been three and maybe
even four days since his face had been visited by the razor. Knowing
that with his hands shaking as they were and realizing that he
was going to be late again, Joel opted to quickly shave his upper
lip and race to the office. A shower would have been nice. No, a
shower would have been wonderful, but he couldn’t afford many
more reprimands from the office manager, Mr. Lee, for being late.
Even if he was the best damn engineer on the waterfront, Joel was
pushing his luck.
After throwing his old rumpled suit on, Joel rushed down the
stairs to the teeming street below where he quickly hailed a cab and
twenty minutes later rushed into the offices of Empire Engineering
Works. Empire was one of those harbor-based engineering firms
that specialized in all kinds of projects on the Hong Kong waterfront.
Joel had been with Empire for many years now, including
postings at the home office in London and an endless string of
assignments around the globe that usually lasted anywhere from
twelve to twenty-four months. He had actually spent nearly three
years at one posting in Amsterdam, but that was only because of
overlapping projects, and once the first project, a new dry dock facility,
was completed, he was asked to finish up a project with another
team of engineers who were designing a new pier for the ferry fleet.
